- The Rodney Group played a huge role in the design of this project right through from the civil design to building layouts.
- We have maximised the storage capacity of the business whilst minimising construction costs in every component right through from the stormwater design to foundation engineering.
![](https://therodneygroup.co.nz/wp-content/uploads/2020/03/19073-Premier-Storage-Image-1-300x169.png)